The road, continued

The road was stabilized while it was still raining, and since the weather has improved the work has continued.  The rest of the sleepers were put in under the road, the sides were built with fire-hardened pine heart logs, rocks were collected from the stream and used to fill in the sides of the road, and we are ready to put the last layer of clay on top to build the road bed.  Of course this wasn't so simple, and involved lots of heavy equipment running back and forth to the streams to collect rocks, gravel, and topsoil, and repairing the heavy equipment and the road as needed to get the rocks to the culvert. We are almost there! 